| New Office Building WITCO
Administration Building, Taft, LA
Designed: 1999 Construction Completed:
2000
Description:
- Engineering design and development of complete plans and specs
- New 24,830 sq. ft., 2-story office building at an existing petro-chemical plant site
- Prefabricated metal building shell, bar-joist and cast-in-place concrete floor on metal
deck, pile-supported cast-in-place concrete slab
- Cold formed metal stud room framing, metal siding and brick veneer exterior, monoslope
metal roof, suspened acoustical ceiling, zoned HVAC units, lighting, sprinkler and alarm
systems, storefront windows, several offices and support facilities
- Associated site work included utility connections
|